54 Hunts Place – WCD Field Notes – 8/29/2017

54 Hunts Place – WCD Field Notes – 8/29/2017

Three trucks were loaded with impacted soils from the east end of the excavation. The last truck left the site at approximately 9:30 a.m. No positive PID readings nor obvious odors were noted at the site perimeter. Backfilling of the excavation resumed after loading had concluded.

NRC and the NYSDEC have indicated that excavation and trucking of impacted soils from the site has now concluded.