Project Details

The project will include the following improvements:

Water System:

  • Removal and Replacement of 1,650+/- linear feet of 12” cement lined ductile iron water main pipe
  • Removal and Replacement of 950+/- linear feet of varying diameter service and connection pipes
  • Installation of new valves, hydrants and fittings
  • Temporary water service provisions
  • Removal of existing and replacement with 2,650+/- linear feet of 8” to 12” ceramic epoxy lined ductile iron pipe

Sanitary Sewer System:

  • 700+/- feet of 4” sewer laterals
  • New sewer manholes, castings and covers
  • Temporary sanitary sewer service provisions

Storm-Sewer System:

  • replacement of existing 18”drainage trunk with 650+/- feet of new twin 24” reinforced concrete pipe and 915+/- feet of new twin 24” DIP
  • Replacement and/or repair of existing catch basins, frames and grates

Roadway and Streetscape:

  • Milling and resurfacing of existing asphalt overlay
  • Areas of full depth asphalt pavement replacement
  • Installation of a traffic signal at the King Street and North/South Greeley Avenue intersection
  • Streetscape amenities such as new granite curbing, concrete patterned and colored sidewalks with brick paver trim
  • Decorative brick crosswalks
  • ADA compliant warning surfaces
  • Areas of decorative bluestone
  • Ornamental LED lighting
  • New / refinished benches, trash receptacles, fluted bollards, bicycle racks, seat walls, ornamental fencing
  • An informational kiosk, planter boxes, new trees with identification plaques, tree grates and a decorative clock.