Improvements
The project will include the following improvements:
- Water System:
- Installation of new valves, hydrants and fittings
- Removal and Replacement of 1,650 plus/minus linear feet of 12 inch cement lined ductile iron water main pipe
- Removal and Replacement of 950 plus/minus linear feet of varying diameter service and connection pipes
- Removal of existing and replacement with 2,650 plus/minus linear feet of 8 inch to 12 inch ceramic epoxy lined ductile iron pipe
- Temporary water service provisions
- Sanitary Sewer System:
- 700 plus/minus feet of 4 inch sewer laterals
- New sewer manholes, castings and covers
- Temporary sanitary sewer service provisions
- Storm-Sewer System:
- Replacement and/or repair of existing catch basins, frames and grates
- Replacement of existing 18 inch drainage trunk with 650 plus/minus feet of new twin 24 inch reinforced concrete pipe and 915 plus/minus feet of new twin 24 inch DIP
- Roadway and Streetscape:
- ADA compliant warning surfaces
- Areas of decorative bluestone
- Areas of full depth asphalt pavement replacement
- Decorative brick crosswalks
- An informational kiosk, planter boxes, new trees with identification plaques, tree grates and a decorative clock.
- Installation of a traffic signal at the King Street and North/South Greeley Avenue intersection
- Milling and resurfacing of existing asphalt overlay
- New / refinished benches, trash receptacles, fluted bollards, bicycle racks, seat walls, ornamental fencing
- Ornamental LED lighting
- Streetscape amenities such as new granite curbing, concrete patterned and colored sidewalks with brick paver trim