Project Details

Improvements

The project will include the following improvements:

  • Water System:
    • Installation of new valves, hydrants and fittings
    • Removal and Replacement of 1,650 plus/minus linear feet of 12 inch cement lined ductile iron water main pipe
    • Removal and Replacement of 950 plus/minus linear feet of varying diameter service and connection pipes
    • Removal of existing and replacement with 2,650 plus/minus linear feet of 8 inch to 12 inch ceramic epoxy lined ductile iron pipe
    • Temporary water service provisions
  • Sanitary Sewer System:
    • 700 plus/minus feet of 4 inch sewer laterals
    • New sewer manholes, castings and covers
    • Temporary sanitary sewer service provisions
  • Storm-Sewer System:
    • Replacement and/or repair of existing catch basins, frames and grates
    • Replacement of existing 18 inch drainage trunk with 650 plus/minus feet of new twin 24 inch reinforced concrete pipe and 915 plus/minus feet of new twin 24 inch DIP
  • Roadway and Streetscape:
    • ADA compliant warning surfaces
    • Areas of decorative bluestone
    • Areas of full depth asphalt pavement replacement
    • Decorative brick crosswalks
    • An informational kiosk, planter boxes, new trees with identification plaques, tree grates and a decorative clock.
    • Installation of a traffic signal at the King Street and North/South Greeley Avenue intersection
    • Milling and resurfacing of existing asphalt overlay
    • New / refinished benches, trash receptacles, fluted bollards, bicycle racks, seat walls, ornamental fencing
    • Ornamental LED lighting
    • Streetscape amenities such as new granite curbing, concrete patterned and colored sidewalks with brick paver trim